Home renovations in Ferndale & Whatcom County
Whole-house renovations and room-by-room remodels — done by a builder who checks the structure before he worries about the paint colour.
Our Main Trade
Good houses, bad floor plans.
Whatcom County is full of solid homes built between the 1950s and the 1990s. The bones are usually fine. What has aged badly is everything else — chopped-up floor plans, tiny closed kitchens, original wiring, single-pane windows, and forty years of whatever the last owner decided to do himself on a weekend.
A renovation is how you fix that without giving up the lot, the trees, the neighbourhood and the school district. We take the house back to what is worth keeping, correct what is wrong underneath, and rebuild it around how you actually live.
Because we came up through framing, we are comfortable with the part that scares most remodelers: moving structure. Taking out a bearing wall, adding a beam, re-supporting a floor, opening a vaulted ceiling. That is where the biggest gains in a renovation usually are.
Scope
What a renovation with us covers
- Floor plan changes — removing bearing and non-bearing walls, adding beams, opening kitchens to living space
- Structural repair — sagging floors, failed joists, post and beam work, foundation-related framing fixes
- Rot and water damage — the usual culprit around old windows, decks, and bathrooms in this climate
- Electrical — panel upgrades, rewiring, replacing knob-and-tube and aluminium branch circuits
- Plumbing — repiping galvanised and early poly, new drainage, relocating fixtures
- Insulation & windows — bringing walls, attics and crawlspaces up to current Washington energy code
- Siding, roofing & exterior — the weather envelope, which matters a great deal this close to the water
- Interior finishes — drywall, trim, doors, flooring, tile, paint, cabinetry and built-ins
- Basement & garage conversion — turning unused square footage into living space that meets code
- Accessibility work — single-level living, wider doorways, curbless showers, ramps
How Renovations Go
Order of operations matters.
Walk the house and find the real problem
Often what you want is not what you need, or it is cheaper than you feared. We look at structure, moisture, electrical and layout before we talk about anything cosmetic.
Design and price it honestly
We scope the work and write it up phase by phase. Where the price depends on what is behind a wall, we say so up front and give you a range instead of a number we would have to break later.
Demolition and discovery
The walls come open. Anything we find gets photographed and shown to you with a written price before it is covered back up.
Structure, then systems, then finishes
Framing and beams first. Then rough plumbing, electrical and mechanical, inspected. Then insulation, drywall, and the finish work — in that order, every time.
Punch list and handover
We walk every room with you, write down what is not right, and finish it before the final invoice.
Worth Saying
We will tell you when not to renovate.
Occasionally a house is far enough gone that the money is better spent on a rebuild, or the thing you want is not achievable inside the existing structure. We would rather say that at the free estimate than eighty thousand dollars into the job.
Questions
Common questions
How long does a whole-home renovation take?
Can we live in the house during the renovation?
What happens if you find something bad behind the walls?
Do you handle the permits?
Free Estimate
Thinking about renovating?
Tell us about the house and what is not working. We will come out, look properly, and give you a written estimate at no cost.
(360) 527-5554